Saturday, October 31, 2009

Three Days of Bathroom Contruction



Here the bathroom is ready for tiling. The floor has been rasied about 50mm to accommodate the drain and then waterproofed to prevent any leaks.
















New toilet in place and the plumbing prepared for the basin.

The toilet has to be replaced because I overtightened one of the nuts holding it on the wall and it has cracked. Curses!

Monday, October 26, 2009

Three days of bathroom destruction.



I've spent three days stripping out the downstairs bathroom. Above is where the shower used to be.

Posted by Picasa