Thursday, August 06, 2009

We Did the Castle


After a leisurely start we made our way to Windsor Castle. The children were not particularly impressed by the longest inhabited royal castle in the world, the weekend home of our monarch. What really fired their imaginations was the room where they could make their own armour, shields and helmets from cardboard. We didn't queue to see the State Apartments or Queen Mary's Doll House as the children were getting bored. We headed out to find some lunch in Peascod street.


We left Windsor late in the afternoon, stopping early in the evening as the rain was becoming rather tiresome.











Windsor Castle from the Thames.







A Cute Boat







Big Wheel in Windsor.



Total distance is 5 miles, 2 flg and 2 locks



Moored at Runnymeade.

Wednesday, August 05, 2009

Windsor


After taking on supplies at Henley we set off down Henley Reach. We were overtaken by a large plastic gin palace at Temple Island just at the end of the reach. He was going too fast and almost swamped a single scull who shouted a few choice words about his ancestry. The rower following asked if we should not all have been in the other channel around the island but I checked my Nicholson's guide and it distinctly says take the channel to the West to avoid rowers. The sign at the north end of the island says all upstream traffic should take the West channel as well. Somebody neglected to tell the rowers to take the East channel.
I saw this floating stand on Henley Reach although the official Regatta site tells me the Regatta was on the last weekend of June.

There were still marquees in the process of being dismantled as well.

As we moved closer to London, the houses became increasingly grand and the boats larger.




We spotted this sign at Bray lock:



Total distance is 21 miles, 3¼ flg and 8 locks.

Moored at Windsor railway viaduct.

Henley


We set off from Wallingford after I had fitted the spare belt to the Travelpower alternator. I screwed my courage up and tensioned the new belt as much as I dared. I feel the previous one may have failed because it was too loose.

Another blogger's boat spotted although not photographed was Pukeko. Looking at the blog now I realise it has not been updated since 2006!

We fuelled up at Reading.

I spotted several interesting boats including Cygnus and Albert in Ovaltine livery.




Total distance is 25 miles, 5¾ flg and 8 locks

Moored in Henley Reach.

Monday, August 03, 2009

First Full Day on the Thames


We left Christchurch Meadow and headed south, passing through Abingdon. Moorings were few and far between at Abingdon. Our first attempt to moor did not go too well. You're supposed to be able to get of the boat after you've finished tying up. We couldn't fight our way out of the trees. As we were expecting guests for dinner we moved a little further away from the bridge and another less than optimal mooring but one on which it was at least possible to enter and leave the boat. We still had to make Jeremy and Fiona walk the plank before we could serve the dinner.


Also, the drive belt failed on the Travelpower, so cooking was done with the domestic alternator trying to drive the electric hob. By morning the batteries were down to 45% according to the Smartguage.



Total distance is 21 miles, 2½ flg and 7 locks.

Moored at Wallingford Bridge.

Sunday, August 02, 2009

Christchurch Meadow


We spent the day mostly in Oxford. Plan A was to do some culture and take our brood to the Ashmolean museum. It would have been difficult keeping all three interested but we were willing to take a crack at it. As it was we found the museum closed for building work until November. Plan B swings into action and instead we spent the afternoon in Oxford's Natural History museum (Yes, they have a T Rex skeleton) and then the Pitt Rivers museum. I love the Pitt Rivers; it's just like an attic, dark, mysterious, cluttered, full of treasures. A recent extension has seen the floor space increased so it is less cluttered but the lights are kept low (presumably to avoid damage to the more fragile exhibits) and you can borrow a torch to help you read the hand-written labels on many of the exhibits.


Carmen Miranda hat made from used cans.










After returning the to the boat we moved Syncopation down onto the Thames opposite Christchurch meadow where we had our dinner before going to see Harry Potter and the Half-Blood Prince at the Odeon in George Street. I kept boring the children by pointing out all the colleges as we passed them on our way to the cinema.


Salters' steamer Wargrave passing the college boathouses near Christchurch Meadow.









Total distance is 1 mile, 4¼ flg and 2 locks.

Moored at Christchurch Meadow.

Saturday, August 01, 2009

Bones Wasn't There


We managed to join the boat by about 11:30 in the morning, just Ewan, Siobhan and I. We had to drop a car in Blisworth for our return home in two weeks time. We also needed to pick up two replacement filter housings for the fresh water pump from the boat yard. The filter housing cover cracked again last Wednesday night. When we arrive back in Blisworth the current Johnson pump will be replaced by a different brand of pump. This one has failed four times now.

I was hoping to capture a photo of another blogger's boat: narrowboat Bones at Thrupp but when we passed, the mooring was empty.


We made our way down to Jericho where Cathy joined us, having taken the car back home and obtained a lift to Oxford. The edge of the canal is very shallow here so we have had to use our new boarding plank for the first time to reach the land.

Moored at Jericho Footbridge.

Total distance is 6 miles, 0 flg and 4 locks

Friday, July 31, 2009

Another Blogger's Boat


I loaded most of the luggage and groceries on board from the very handy car park at Pigeon Bridge before setting off again. I decided to push on to get within walking distance of Kidlington to make it feasible to join the boat by bus at the start of our holiday tomorrow. There are a remarkable number of long term moorings around Shipton on Cherwell and Thrupp and I was unable to find a mooring until it was nearly fully dark. It was too dark to take a picture of Maffi's boat, the Milly M, at Thrupp. I moored outside the surprisingly quiet Jolly Boatman restaurant.

Moored at the Jolly Boatman, Thrupp.

Total distance is 4 miles, 0 flg and 2 locks.

Wednesday, July 29, 2009

Another Evening Run


I moved the boat from The Cleeves winding hole down through two more locks to a position just above Pigeon lock. It was beginning to get dark when I moored up so the location was not ideal with soft bank and a narrow towpath. I had my doubts about the security of the position the mooring pins were in but couldn't really move to find anything better.

Moored at Pigeon Bridge.

Total distance is 3 miles, 4¼ flg and 3 locks

Tuesday, July 28, 2009

Onward! In Little Steps


A short hop tonight after work, from Somerton Mill bridge to Just past The Cleeves Winding Hole. A very pleasant evening's cruise. Nether Heyford is a very pretty village with a railway station and is a popular mooring place. A very helpful chap opened the lift bridge 205, solving my dilemma about how to tackle it single-handed. I was very careful to slow to tickover past every boat and still had a head poke out to say the speed limit is 2mph! No it's not. The limit is 4 mph. We are asked to slow to tickover past moored boats and to make sure that we don't travel fast enough for our wash to break when this happens below 4 mph. I'm always careful to abide by these rules and I resent it when folk tell me I'm speeding when I'm not. One thing that was obvious was that boats with slack mooring ropes move far more when boats pass, so try tightening your ropes Mr. 2mph!

2 miles, 5¼ flg and 2 locks.
Moored near The Cleeves Winding Hole.

Sunday, July 26, 2009

Gazelle

I read about narrowboat Gazelle, on sale some weeks ago. I passed her today at Aynho. For the price being asked £118,000 she was in a state, externally at least.



Solo Again


I started late from Aynho Wharf and then had to queue for 1 1/2 hours at Somerton lock. I put Arrow's life jacket on him because he has a knack for falling in the canal, sometimes the locks. As Somerton is one of the deepest narrow locks on the system I felt it would be prudent. Even though I had to wait for so long to get into the lock there was plenty of help once there as there were at least four boat crews waiting their turn.

Somerton Deep Lock
























3 miles, 5½ flg and 1 lock.

Moored at Somerton.

Saturday, July 25, 2009

Solo to Aynho


Day 5 of the delivery cruise. I was by myself for this part of the cruise. Siobhan stayed at home to play a new game on the Wii. A three foot long area of paint below the gunwhales has been scraped down to the metal by the metal piling at the canal side where Syncopation was moored against the inside edge of a curve at Cropredy. More maintenance next week.
The weather was warm and sunny. Moored at Aymho Marina.


Total distance is 11 miles, 2½ flg and 8 locks.

Monday, July 20, 2009

Blogger's Boat Spotted


Here is Alnwick at Cropredy
 
Owned by Graham and Jane Oliver.
Posted by Picasa

Sunday, July 19, 2009

Delivery Cruise Day 4


We were rudely awakened by boats trying to pass us. During the early morning the first two boats to pass dislodged the pin from the front mooring. Luckily our mooring pins have a loop at the top and I'd passed the mooring rope through these and the pin was easy to retrieve from the water. After a prompt start at 08:00 we continued southwards. There is a long lock-free stretch from Napton top lock for the next 11 miles to Claydon locks and this took most of the morning to cover.

Dominic and Cathy jumped ship at the first lock, Varney's to go home and fetch Ewan's car seat. I carried on single handed to bridge 153 in Cropredy, site of the famous Bridge stores, spotting the narrowboat Alnwick just before mooring on the 14 day moorings at the south of Cropredy.

Moored at Cropredy.

Total distance is 13 miles, 6½ flg and 9 locks.

Delivery Cruise, Day 3


We got off to a late start after shuffling cars, passing through Braunston, taking on fuel at Braunston Boat Services (next to the Bottom Lock Chandlery). We made good time however, arriving next to the Engine Arm at Napton before the farmhouse cream teas closed. Ewan opted for a strawberry ice cream and was served with Napton Waterbuffalo ice cream. I would have liked to try some but he ate it all.

Thanks are also due to our friend Andy Ogden who accompanied us from Daventry to Napton, crewing ably.






Moored at Napton top lock.

Total distance is 9 miles, 3½ flg and 8 locks.

Sunday, July 12, 2009

Up Whilton locks


The delivery cruise continues. Today we spent a leisurely afternoon going up the Whilton locks in the company of nb Selena Rose. Arrow was dressed in his new lifejacket. He has fallen in the canal at least daily whenever we are on the boat and occasionally ends up in locks so we bought him a lifejacket for when we cruise the Thames.

Total distance is 1 mile, 2½ flg and 5 locks.

Moored just below Buckby top lock.

Saturday, July 11, 2009

Delivery Cruise


I started the delivery cruise in preparationfor this year's holiday (the journey to put the boat in the starting position for the start of the holiday) today. Syncopation is looking a little disreputable as the trees hanging over the mooring were cut down a couple of days ago leaving all the boats covered in chainsaw dust. This is a very coarse sawdust, made of flakes up to ten millimetres square. Some of it started to blow away in the light breezes we encountered but the majority of it has been glued to the roof by recent rains.

Total distance is 12 miles, ½ flg and 0 locks.

Moored at Whilton locks.

Friday, July 10, 2009

When 3/4 inch is not 3/4 inch


When I ordered the replacement hose fitting for the calorifier I measured the thread on the fitting to be replaced. I naively assumed that 3/4 inch measured across the thread meant it was 3/4 BSP thread. When the part arrived I found the existing fitting will nearly fit inside the new one which has an outside diameter of nearly an inch. Turns out 3/4 inch BSP thread refers to the internal diameter of the steel tube it was designed to be on the outside of. My fitting is actually a 1/2 inch BSP thread. I'll have to visit the chandlery in person tomorow to try to find a matching part.
If they don't have one in stock I'll have to decide whether to start the delivery cruise tomorrow with the calorifier disconnected or leave it another week and risk not making it to Oxford in time for the start of August.

Wednesday, July 08, 2009

Waiting for Bits


I'm waiting for parts for Syncopation. Two Sundays ago I started tackling a small leak on the Calorifier feed pipe (not the one that went last time) and found the same problem with the connector as I had on the other side. After nearly a week of faffing about I ordered the part from www.chandleryworld.co.uk and am still waiting for it to be delivered. It should arrive today. If all goes well I'll be able to fit it before Saturday in time for the start of the pre-holiday delivery cruise o Oxford.
I also decided to fix a very minor leak under the bathroom basin. Copper pipes and push fit plumbing don't go together well when the copper pipe has been cut square with something like a hacksaw in the factory. The bathroom tap hot pipe had damaged the pushfit pipe fitting o-ring and this developed a slow drip last Easter. I had to dismantle the cold feed as well to get to the hot feed and when I reassembled it after fixing the leak on the hot feed I found I have a leak on the cold feed. Now I have the parts to fix the cold feed (compression elbow fitting) and I'll fit that when I go to the boat to fit the calorifier feed pipe.

Wednesday, June 17, 2009

Aldershot


I was sent to Aldershot for two days by my employers. While there I found the statue of the Duke of Wellington that was removed from the top of the Wellington Arch near Hyde Park in 1883. The Duke lived in Apsley House on Hyde Park corner. The statue used to be on top of the arch in front of the house in Wellington Square. It was moved to Aldershot in 1885 and restored in 2004.


Sunday, June 07, 2009

Roses Completed


Here are pictures of the finished results. The first two are of the inside of the two side hatches:







And the last picture is of the rear hatch doors:


Sunday, May 31, 2009

Roses


I've been practising painting traditional roses for the boat. Here's the most recent practice piece.

I've just completed the panels on Syncopation and I'll post pictures later when I've taken some.

Saturday, May 30, 2009

Happy Birthday Arrow


It's Arrow's second birthday today.

Sunday, May 24, 2009

Crick


It's that time of the year again. We went to Crick for the boat show. It was hot, but bearable. The children enjoyed a trip in a Bell boat courtesy of Northamptonshire Scouts.
I went through all the marquees looking for a Smartgauge. Unsuccessfully. I also had a look at some canal art. I'm trying to get the shape of the petals on my roses right before committing to completing the roses on Syncopation.
I also found a nice slant on the traditional diamond pattern on an Ownerships narrowboat, King Arthur:

Friday, May 01, 2009

Lamp Shade


Another visit to the vet for the dog. The stitches have to stay in a bit longer. The cast has been removed from Arrow's paw but he now has to wear this lampshade to keep him from picking at the stitches.

Thursday, April 23, 2009

A Visit To The Vet


Arrow went lame while we were out walking so I brought him home as soon as possible. In the dark there was a little blood visible on his paw. Half an hour later he was still bleeding on the bathroom floor so I called out the emergency vet and we went to meet her at the surgery. She kept him in overnight to repair his paw. He'd managed to cut open one of his pads - to the bone. Luckily he missed the tendons and major nerves. He came home from the vet with his paw in a cast and a course of antibiotics.

Friday, April 10, 2009

Home Again


We set off early (for us) as we wanted to be sure of arriving back in Blisworth with daylight to spare.


We stopped at Cosgrove for lunch:



and travelled in the company of a convoy of 12 boats from the Lionheart Boat Club of Great Linford whose membership are restricted to a maximum length of 38 feet as they moor pointing out into the canal in a layby. The great advantage is that they can fit four of their boats into a Grand Union broad lock at a time. Unlike the broad beam "Moose Drool" which completely filled the lock, going in the opposite direction.


We passed Castlethorpe Wharf from which we could just about see the windows of our first home at 3 South Street. At Stoke Bruerne we refuelled with ice cream at the Boat Inn before tackling the Blisworth tunnel. We met a novice steerer on a boat from Gayton Marina in the tunnel a short way from the north portal who stopped and it took a few minutes for them to straighten out enough to pass. We finally moored Syncopation at her home mooring again at about 5.30 PM.



Moored at Blisworth.

Total distance is 13 miles, 1¾ flg and 8 locks.

Thursday, April 09, 2009

Back Through Milton Keynes



We passed back through Leighton Buzzard, picking up a replacement satellite cable connector from Homebase as well as essential supplies at Tesco and passing the Wyvern Shipping hire base.



We passed through Milton Keynes again in the afternoon, a surprisingly attractive place from the canal and stopped in Stantonbury.



Moored Stantonbury Bridge no. 75.

Total distance is 19 miles, ¼ flg and 8 locks.

Wednesday, April 08, 2009

Turn-Around


We turned around and headed back north to our home moorings today. We left Berkhamstead in the morning, passing back trough the Tring summit level and back down the Marsworth flight (hello again nb Harnser). We stopped for lunch near Wilstone reservoir, one of the ones built at Marsworth to supply water for the canal. They are also very picturesque, with attractive walks on their margins. We ventured into the woods and found mud and a stream.




After we had emptied his wellingtons, showered him down and dressed him in dry clothes Ewan was fine.



Moored at Slapton.

Total distance is 11 miles, ½ flg and 23 locks.

Tuesday, April 07, 2009

Marsworth and the Tring Summit Level


Cathy left for the day to deliver some of her paintings to exhibitions at Stowe House (Buckingham Art for All) and the Royal Academy Summer Exhibition. We were joined by our friends Brian and June and their daughter Hannah for the day.



We passed up the Marsworth flight to the Tring summit level and then began descending to Berkhamstead where we stopped for the night.

At the bottom of the Marsworth flight is the junction with the Aylesbury arm.
I walked this arm as part of a sponsored event when I was at school in Aylesbury in the late seventies.


At the top of the flight is Bulbourne junction where the Wendover arm branches off and wooden narrowboats are still built and repaired at Bates' boatyard.



At Cowroast we passed the working pair Owl and Hampton.




Moored at Berkhamstead.

Total distance is 9 miles, 7 flg and 21 locks.

Monday, April 06, 2009

Near Ivinghoe


We passed through Leighton Buzzard today with it's very usefully located canalside Tesco store. The nearby DIY store is great for hardware bits as well.



We passed this caravan and lots of wildfowl including several herons and a pair of mandarin ducks.




Moored near Ivinghoe

Total distance is 9 miles, 5½ flg and 8 locks

Sunday, April 05, 2009

After Milton Keynes



Today was a day of aqueducts and surprisingly green route through Milton Keynes. We passed Thrupp Wharf near Castlethorpe where we lived just after we got married in 1989. I often imagined passing that spot in our own boat. Today was that day. Later we passed over the new Grafton Street aqueduct.



We picked up our friends the Stockers for a couple of hours in the afternoon, dropping them off at Fenny Stratford lock.



This raft appears to have been abandoned in the canal.


We arrived at Willowbridge marina in the nick of time to fill Syncopation's fuel tanks.

Moored Near Stoke Hammond.

Total distance is 17 miles, 7¼ flg and 3 locks

Saturday, April 04, 2009

Yardley Gobion Again


We have returned to Yardley Gobion, the destination of our initial weekend cruise in Syncopation. This time we're out for a little longer and the boat has a few more battle scars. We started out just after 4PM and arrived near Yardley at about 8PM.

Moored near Yardley Wharf.
Total distance 6 miles, 2¾ flg and 7 locks and 1 tunnel.

Saturday, March 28, 2009

Spring


I did some spring cleaning today. Upholstery mostly as we've recently acquired a Vax.



Spring has sprung in Blisworth. The blossom is out over Syncopation. There are still a lot of little jobs I'd like to get done but it seems unlikely any more will be before we go boating the week after next.

Monday, March 23, 2009

Syncopation Spotted


Hadar passed Syncopation at her mooring yesterday. See the picture of the cherry blossom.

Wednesday, March 18, 2009

Water at Gayton


Last weekend saw me washing the outside of Syncopation for the first time this year. There was a lot of decayed leaf and algae to scrub off the non-slip roof surface. I washed the sides down and everything looks shiny again. Today I took Syncopation up to Gayton junction to fill the fresh water tank and empty the toilet cassette. I even had enough time after I tied up at our mooring to polish one brass mushroom vent. As it had a solid accumulation of tarnish developed since last October it took nearly 30 minutes. At that rate I have a good two or three hours of polishing ahead of me to get all the exterior brasswork sparkling again!

Friday, March 06, 2009

The Last Flying Vulcan Needs You


The Vulcan to the Sky trust need your help. They restored Avro Vulcan XH558 to airworthiness and it's a remarkable thing to see this relic of the cold war in flight. But now they are running out of funds. You can pledge cas on their web site or sign the petition to ask the Government to step in to help assure the future of this unique aircraft.

Saturday, February 21, 2009

Dog in Harness


Arrow is a dog who loves to pull on a lead. He's like a small carthorse when he's got his lead on. That's why he now wears a Halti head collar whenever he is out with us. The collar stops all the pulling.

Girly Switch Back On


After some consultation with Vetus I have managed to fix Syncopation's bow-thruster. The problem began when I inadvertantly replaced the bow thruster battery back to front after removing it for charging. The main supply fuse blew when the bow thruster battery formed a short circuity with the main domestic battery bank. After correcting that problem I found the bow thruster control panel would not switch on. After I checked all the wiring and the supply fuse at the bow thruster end I was at a loss. After a quick call to Vetus and a post on the Canalworld forums I decided to check the supply panel fuse inside the bow thruster unit. I had found this fuse before but it looked like another socket for a cable connection. Today I replaced the fuse and everything works!

In the meantime, Mill Wharf Boats have replaced the main water supply pump filter housing under guarantee. The filter cover has cracked three times since we took delivery and leaked into the saloon. Hopefully a complete new filter housing will resolve this.

Saturday, February 14, 2009

Time to Get the Haynes Manual Out



On Thursday Cathy started the Picasso up not realising the wipers were switched on and the blades were frozen to the windscreen. Both wiper arms were bent and the wiper blades were destroyed.


On the Picasso the wipers cross in the middle of the screen, passing wihtin about a centimeter of each other. They were impossible to bend back accurately and so one of the arms had to be removed so that the drivers side wiper could work unobstructed.

Our friendly local mechanic tried to order new wiper arms only to find that there are none available until after 24 Feb.

So we hit the internet looking for second-hand wiper arms and came up with a good deal from Cit-Ren. The parts arrived today (the day after they were ordered) and I will fit them this weekend with the help of my trusty Haynes manual.

Posted by Picasa

Friday, February 06, 2009

Lunch Time in the Snow

Lots of snow here so I'm working from home as the transport infrastructure between here and Central London is somewhat unreliable. So in my lunch break I was able to play with the family. We built snow men, sledged down the slopes in the nearby fields on teatrays, had snowball fights and watched the dog running around.


Sunday, January 25, 2009

Charging all the Time


I reconnected the warning lamp on the domestic alternator and now have a charge being supplied to the batteries whenever the engine is running. As expected, the Victron multiplus tends to run through a very short charging cycle as it now detects the voltage being supplied by the domestic alternator and assumes the batteries are at full charge. On balance it's probably the arrangement that is most likely to ensure the batteries are adequately charged because the 240 v supply to the Victron is only likely to be present for about 50% of the time the engine is running.

Saturday, January 24, 2009

Party Flood


We threw a floating party for Siobhan's eighth birthday. We made our way up the cut from our mooring at Blisworth to the winding point at the top of Rothersthorpe locks turned there and went back to Blisworth. We stopped at Gayton Junction for a Pinata.



Here I am with the chinese dragon pinata suspended from the boat hook on the tow path. The greatest danger during the exercise is from young children swinging a stick. It is much worse if the child is wearing a blindfold - something we just had to try.

Alas, as we approached Blisworth again and after running three bowls of washing up water the cover on the freshwater pump cracked again, just like last summer. We're quite practised in the leaking pump drill now and the situation was under control in about 30 seconds. I think I'll be returning the whole pump under guarantee rather than just the cover this time.

Total distance is 3 miles, 6¼ flg and 0 locks.

Wednesday, December 24, 2008

Multiple Charging Circuits


I returned to the boat with a new fuse for the bow thruster circuit. Once connected I measured the voltage at the bow thruster with the Travelpower providing 240ac to the Victron Multiplus inverter/charger. All is well there. Further tests at the domestic battery bank revealed the domestic alternator was not supplying any current.Time for a bit more wire tracing. With the help of the Beta Marine engine manual I found the cable that normally connects the domestic alternator D+ terminal had been cut at the engine end. This meant that the alternator will not start supplying current until it reaches quite high revs.
Alternator fact: The alternator only needs a current to energise it at low revs. At high revs the weak magnetic field already present in the rotor will generate enough current to energise the alternator.
I think it was disconnected to avoid having the alternator and Victron compete to charge the batteries. I'm going to reconnect it because the domestic alternator is essential for recharging while cruising when the Travelpower is not running. The two charging systems will only compete in as much as the one with the lowest voltage output will shut down and leave the field clear for the other. I'd rather have the two systems running than none at all as we had when the Travelpower drive belt broke.

Friday, December 12, 2008

Things that Go Pop


After two weeks of battery-pampering I returned the batteries to Syncopation. There were five to refit: four domestic and one bow-thruster. I put the bow-thruster back in first and then got to work trimming the side of the battery box to make replacing the domestic batteries easier. Twenty minutes later I had all the batteries in and began connecting them. I connected the cable from the bow thruster battery to the first in the domestic bank and was surprised by a fat spark. When I touched the terminal with the cable again there was a bigger spark and the nearby fuse blew. Oops! A quick check revealed I had put the bow thruster back in back to front, so the 175 Amp fuse protecting the bt battery charging cable blew when I completed the circuit.



When everything was connected I started the engine and checked the battery voltage and found as I suspected that the domestic alternator was supplying no charge. I switched on the Travelpower and fired up the Victron Multiplus and found a healthy charge going into the batteries.


A check of the instrument panel revealed no red light on starting the engine for the domestic alternator so I traced the cable from the back of the panel. The loose cable looked suspicious and proved to be the connection from the alternator to the charge light - so no charge. It was easy to fix - just plug it in - and the domestic alternator was still not charging. Further investigation required I think.