Lined Out
Syncopation now has full set of windows and Houdini hatches. The shell is now weather proof and the first stage of the interior fittings have gone in; the lining. Ash faced plywood sheets have been fixed to all the interior surfaces. The lining has received a preliminary coat of varnish to protect it during the fit-out. These sheets will be removed and replaced during the next phase, the electrical cabling installation. We have finalised the locations of light fittings, switches and electrical sockets. Now the shell is weather proof the engine can be installed so Syncopation will move back into the dock soon for engine installation, skin fittings for the plumbing and another coat of primer for the winter.
No comments:
Post a Comment