Another really full day. We to set off promptly today as we needed to be in Oxford this evening to pick up the car and collect exam results. On-board systems failure made for a change of plan. The toilet clogged just after setting off. After about 20 minutes poking and banging the pipes, I decided we needed a new pipe.
This is the pipe originally installed in 2008.
I took the bike back to Tadpole Bridge, picked the car up and after telephone enquiries with Tooleys boatyard in Banbury made my way to Lee San in Fenny Crompton where I purchased a new length of pipe. Problem solved, not a moment too soon for the crew.
We took the Duke's Cut to rejoin the Oxford canal.
I found a mooring at Aristotle Bridge.
Total distance is 19 miles, ¾ furlongs
and 6 locks
Moored at Aristotle Bridge, Oxford canal.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment