Friday, March 21, 2008

Bathroom Taking Shape


Syncopation's bathroom is taking shape. The bulkhead that covers the cabin side and hides the pump is in place. The shower tray has been sourced. The carcase for the cabinet that supports the bathroom basin is in place. More varnish has been applied to the interior so that all the new woodwork is now protected.



Thursday, March 06, 2008

Bunk Room Carcasses


The carcasses have been fitted in the bunk room. The children were excited by the end of bed bunk ladder.


The dinette has a sliding base at one end that solves the problem of the seats being too short to fit comfortably under the table that is the same size as the gap between them.


The table fits between the two seat bases to make a flat bed. It lifts out and attaches to the wall above and slightly forward of the gap it comes out of. The rear-most seat base then slides forward and slightly under the rear edge of the table to make a more comfortable sitting position.

Saturday, March 01, 2008

Dog Mooring

Kitchen Carcases



The kitchen is taking shape with the carcases having been fitted.



The bunks in the bunk room behind have been fitted with an attractive ladder at the end. We've delivered more fittings to the boat yard, including the shower screen and some electronics that need measuring for the entertainment cabinet. The skin fittings have been attached and the plumbing from these has been attached. The cold water supply system has been pressure tested.