Saturday, February 02, 2008

Pipes and Wires


Work progesses on Syncopation. The water supply and heating plumbing has been installed and the electric cables for the interior 12v and 240v circuits have been hung in place.




Syncopation still seems quite large inside - probably due to the lack of interior fittings or bulkheads. I'm still working on a Photoshopped picture of the proposed exterior paint scheme.
In the meantime here's the current exterior view:

From the steerer's position:




And from across the cut:

No comments: