Kitchen So Far
Here, by request, are pictures of my efforts so far in the kitchen.
This side is almost complete:
This side has farther to go:
Day to day ramblings.
Here the bathroom is ready for tiling. The floor has been rasied about 50mm to accommodate the drain and then waterproofed to prevent any leaks.
New toilet in place and the plumbing prepared for the basin.
The toilet has to be replaced because I overtightened one of the nuts holding it on the wall and it has cracked. Curses!