Syncopation's systems are being commissioned. The woodwork will be completed in the next week and she will move to dock for painting.
The heating system has been filled and tested. Most rooms have finrad type radiators at floor level except for the bathroom and the central bunk room. These two have towel rails:
The side hatches have been glazed. The glazed panels open as a bi-fold door:
Closed
Open: