Saturday, May 24, 2008

Syncopation in the Paint Dock

Syncopation is now in the paint dock being coach painted. During the last week the coach lines have been masked and the sides, panels and handrails have been undercoated. Even in undercoat, Syncopation is seriously shiny:

Inside, the curved doors have been fitted in the kitchen:

The exhaust has been fitted through the side of the hull, the electrical cupboard has been built and the controls have been fitted to the outside of the cupboard:

Side hatch glazing from the outside:

No comments: